Client
Castle School Education Trust
Architect
Quattro
Structural Engineer
Campbell Reith
Quantity Surveyor/Project Manager
Burke Hunter Adams
Project Sectors
Education
Castle School Post-16 Centre
BJP provided the Mechanical and Electrical Services Design to the latest technology for the relocation of the 6th Form into the new Post-16 Centre at the main school site.
The Post 16-Centre comprises of a social and study area, quiet area, offices and mezzanine level to accommodate the intake of 6th Form students for the new academic year.
The Centre was rewired in full with new highly efficient LED lighting, small power, data/Wi-Fi provision, audio visual systems and alarms. The mechanical installation utilised existing fan convector heaters, with new VRF DX heating system, ventilation, and hot and cold-water services.
The new mechanical and electrical installation is integrated and co-ordinated with existing site wide services within the school.
BJP worked closely with the Client, project team and appointed contractors during the construction period to ensure the project was delivered on time and within budget.
Education
Marlwood School
Complete refurbishment of the main school building with new science rooms, food technology, art, resistant materials, graphics/textiles and general teaching and staff areas.
Robert Blake Science College
Creation of 4no new Science Classrooms and minor alterations to meet the future demands of the College.